Ballard Church Cuts Energy Costs 45% With New Boiler / Commercial HVAC System |
The Challenge:
Originally installed in 1925, the church’s 1 MBTU oil fired (later changed to gas) furnace was dirty, expensive to operate, unreliable and a constant source of frustration. The equipment room (think dungeon) in which it was located was cramped for space - making repairs and /or installation of a replacement system very difficult. To make matters worse the boiler was connected to an air distribution system that was also obsolete, and inefficient. High operating / repair costs and uncomfortable conditions compelled church leadership to look for answers.
Added on 09/22/2011
Filed Under
Commercial Air Conditioning, Commercial Heating Systems, Heating and Air Conditioning, Heating Repair, Heating Systems by Heating, Cooling & HVAC Blog by MM Comfort SystemsComments (0) |
No comments have been added yet to this post.
Post a comment - top
Please register to leave a comment.
| Password |
| Click to register |
| Archive |
| May, 2012 April, 2012 March, 2012 February, 2012 January, 2012 December, 2011 November, 2011 October, 2011 September, 2011 August, 2011 July, 2011 June, 2011 |
| View By Author |
| Amanda Eister Craig Williamson MM Comfort BLOG New User |